2015 Cruiser RV Shadow Cruiser Series M-195 WBS Specs

2015 Cruiser RV Shadow Cruiser Series M-195 WBS Specs
Specifications
Floor Plan

Type

Travel Trailer

Basic Warranty (Months)

12

Revision Status

Carryover

Maximum Sleeping Capacity

4

Number Of Slideouts

1

Length (ft-in / m)

22' 0' / 6.7

Interior Height (in / mm)

81 / 2057.4

Base Weight (lbs / kg)

3920 / 1778.1

Carrying Capacity (lbs / kg)

2150 / 975.2

Hitch Weight (lbs / kg)

470 / 213.2

Number Of Axles

2

Air Conditioning (BTUs)

13500

Heater (BTUs)

16000

Fresh Water Capacity (gal / L)

44 / 166.6

Gray Water Capacity (gal / L)

38 / 143.8

Black Water Capacity (gal / L)

38 / 143.8

Propane Capacity (gal / lbs)

14.2 / 60

Water Heater Tank (gal / L)

6 / 22.7

Air Conditioning

Optional

Kitchen Dinette

Pedestal Table

Interior Flooring Type

Carpet / Vinyl

Master Bedroom

Standard

Number Of Bathrooms

1

Shower

Standard

Television

Optional

DVD Player

Not Available

Patio Awning

Optional

Leveling Jack Type

Front Manual / Rear Manual

Power Retractable Entry Steps

Not Available

Interested in Selling Your Vehicle?

Get a verified offer sent directly to you.

JD Power Travel Trailer/5th Wheel Buying Program

Take advantage of real dealer pricing and shop special offers on new and used Travel Trailers/5th Wheels. Select your Travel Trailer/5th Wheel to get started.

Progressive RV Insurance

Insure your 2015 Cruiser RV M-195 WBS for just $125/year*.

  • Leader in RV Insurance: Personalize your policy without breaking the bank.
  • Savings: We offer low rates and plenty of discounts.
  • Coverages: Specialized options for full timers and recreational RVers.
*Annual premium for a basic liability not available in all states.

Other Resources

Use these tools provided by our trusted partners to complete your RV shopping experience.

Attention West Coast RV Owners

We’ll pay CASH for your RV — TODAY!

Sell Your Travel Trailers/5th Wheel with GoRollick

Receive a direct offer on your Travel Trailers/5th Wheel with GoRollick.

Trucks and SUVs for Hauling

2026 GMC Sierra 1500

2026 GMC Sierra 1500

9,000 lbs towing capacity

Starting at $38,300
2026 Jeep Gladiator

2026 Jeep Gladiator

4,500 lbs towing capacity

Starting at $39,820
Best car deal in 43215

Research Other Trucks and Cars